What Are We Working On

Dan Jones Road Widening

  • Phase 1 projected to start in 2023
  • Phase 2 projected to start in 2024

The Town of Avon, with funding from the FHWA and administrative oversight from the Indiana Department of Transportation (INDOT), intends to proceed with a roadway improvement project. The project is located on Dan Jones Road, beginning 0.005 mile north of Oriole Point Drive and extending 1.24 miles north before ending 0.07 mile north of the intersection at Main Road in the town of Avon, Hendricks County, Indiana. The need for the project is evident based on ongoing growth in the area and resulting anticipated traffic volumes. The purpose of the project is to improve the roadway so it can accommodate future traffic volumes and operate at an acceptable level of service during the existing year and during the design year of 2043.

The current scope of work will include the reconstruction of Dan Jones Road from a 2-lane minor arterial to a 4-lane roadway. The roadway is anticipated to be widened to the east and west equally from the existing centerline. The typical roadway section for Des. Nos. 1801463 and 1901763 is anticipated to consist of four 12-foot-wide travel lanes (two in each direction), with a 15-foot-wide raised median, curb and gutter, 10-foot-wide multi-use path on the east side, and a 6-foot-wide sidewalk on the west side. The 15-foot-wide raised median would transition to a left turn lane as warranted at intersecting roadways. The sidewalk and multi-use path will be separated from the road by a 5-foot-wide grass buffer strip. The Des. No. 1901763 project also includes construction of a 2-lane roundabout at the intersection of Dan Jones Road and CR 150 South, and Des. No. 2001663 includes the replacement of Hendricks County Bridge 251 (NBI No. 3200251).

100 South Road Widening

Design continues and right of way purchasing is occurring.

Fall 2021 Street Sweeping Overview

Schedule for the Town of Avon Street Sweeping (updated 11/8/2021)

Happening between November 1st and November 30th, 2021.  Please make sure to NOT park on the street the day before, the day of, and the day after the posted dates below.  

This event will be updated once subdivisions are completed, please check back for daily updates.  The order listed below does not indicate the order of when they will be completed.

Scheduled for the Week of November 8th 2021

  • Reserve A @ Shiloh Creek
  • Stone Haven
  • Regency
  • Waterford Lakes
  • Wyn Farms
  • Permission Grove
  • Harvest Ridge
  • Avon Heights
  • Avon Woods
  • Stratford of Avon
  • Sycamore Creek
  • Park Place
  • Austin Lakes
  • Heathermor